Saturday, 5 May 2012

April Downpours

Towards the middle of April, the heavens opened.


Which made work on the site hard going, especially for Chris on the roof.




They were able to pour concrete in to form the base of the pool.


Inside the stables, things were a bit drier.


The concerete was poured over the underfloor heating to finish the floors downstairs.





No comments:

Post a Comment