Sunday, 6 May 2012

The flood

The rain continued through the last week of April and the first week of May.


So conditions were pretty miserable for those working outside but at least we know the pool holds water!


Inside the stables, where things were drier, the plastering was continuing a pace.


The skylights have been inserted into the roof which makes a huge difference inside.


Slowly the slates are going on the roof in between downpours.




The cows are allowed into the neighbouring pasture land on 1st May so the need to replace the fence between our land and theirs became a priority.


Gary, Matt and Chris have built a beautiful retaining wall using the stone excavated from the pool.


Mike continues to find things to dig (drains) and deliveries to accept.